Thursday, May 3, 2012

Exhibition Set Up

I arrived at 9:45 this morning as an artist to hang up my piece since I was not part of the technical crew in the morning due to my job with undergrad show. Things were delayed and somehow command only fell under one person, so there was no clue on what to do and much time was wasted. I ended up helping out with last minute efforts to get things organized. Savannah and I made a run to the lab to pick up supplies needed for morning set up.  Around 1 I headed back to the lab to help with undergrad show since I was really needed there to help/deter people from Glen while Glen finished things up for the show. I stayed through the show to help retrieve items from undergrads that we needed immediately after the show ended around 7:30. I got the box for the 3D TV and directed people on what things needed to go and took inventory on last minute changes/locating items. The 3D TV took the longest since it was the most expensive and delicate piece of equipment. Around 10:30 we headed to exhibition space and started unloading and setting up. I helped with repair some of the frames that fell, and covered technical issues. Garrett and I ended up making another run to the lab for needed things. Then I helped finish up the framing and moving tables/general cleaning. I got let go a little before 2am. It was an exhausting night just because it was a very long day, but due to the bumps in the road I felt it was very well recovered and dealt with. 

No comments:

Post a Comment